Mallorca Pool Builders 29.05.2026 8 min

Pool permits in Mallorca: a step-by-step guide

Pool permits in Mallorca: a step-by-step guide

Almost every new pool in Mallorca needs a building licence from the town hall before any digging starts. This guide explains how that process works: which permit applies, the extra rules on rustic and coastal land, what the application contains, how long the town hall has to decide and what it costs in tax and fees.

It is general information based on the Balearic urban planning law and the municipal tax ordinances, not legal advice. Each town hall applies its own planning rules on top, so always confirm the details with the town hall (ajuntament) where the property is.

Prefer to read it offline or share it? Download this guide as a PDF (4 pages).

Do you need a permit for a pool?

In practice, yes. Balearic urban planning law (Llei 12/2017, known as LUIB) knows two ways of getting approval for works: a building licence, or a prior notification (comunicació prèvia) for simple works that need no technical project. Earthworks are explicitly excluded from the simpler notification route, and a pool means excavation. So a pool normally needs a full building licence, usually based on a project drawn up by an architect or technical architect.

You may hear the terms obra mayor and obra menor. They are used by town halls and builders, but they do not appear in the law itself. What decides the route is whether the work needs a technical project.

Special cases: rustic land and the coast

Rustic land

If the property is on rustic land (suelo rústico), the law sets hard limits on pools:

  • One pool per finca, at most.
  • The pool must belong to a single-family home on the plot.
  • The water surface of a new pool may not exceed 35 m² and its volume may not exceed 60 m³.

A classic 8 x 4 m pool (32 m²) fits under the surface limit; a 10 x 5 m pool (50 m²) does not. On protected rustic land the simpler notification route is never available, and building without a licence there is treated as a very serious infraction.

The house itself must be a legal dwelling. If it is not, sort that out before planning a pool. More detail in our guide to pools on rustic land.

Near the coast

Spanish coastal law sets a protection zone of 100 metres inland from the shoreline, reduced to 20 metres on land that was already classed as urban in 1988. Inside that zone, the coastal law restricts what can be built, and any permitted use needs an authorisation from the regional government in addition to the municipal licence. Whether a private pool can be authorised in the zone depends on the case, so check this before the design is finished.

Holiday rentals

If the property is rented out to holiday guests, see our guide to pool rules for holiday rentals.

Step by step: who does what

  1. You, the owner, are the applicant. The licence is requested in your name (as promotor).
  2. An architect or technical architect draws up the project. Where a technical project is required, the town hall will not accept the application without it. Some town halls require the project to be stamped (visado) by the professional association; ask yours.
  3. The application goes to the town hall, with the project and any other authorisations the site needs, such as the coastal authorisation.
  4. The town hall decides. It has a legal maximum of three months from a complete application (see below).
  5. Before work starts, the town hall must be notified at least ten days in advance, and the construction tax (ICIO) is due.
  6. When the pool is finished, the directing technician signs the end-of-works certificate. Ask the town hall whether it also requires a first-use licence for the pool.

Documents for the application

Each town hall has its own list. As an example, Calvià’s licence catalogue asks for:

  • the project (basic project, or basic and execution project)
  • proof that the licence fee is paid
  • a land registry extract (nota simple) and the cadastral reference
  • photographs of the site
  • a construction waste management contract and a waste valuation
  • a health and safety study
  • an electrical project where the low-voltage regulations require one

To collect the licence: the appointment of the directing technicians and the builder, proof of the ICIO self-assessment and a deposit for construction waste.

How long does it take?

The law gives the town hall a maximum of three months to decide on a licence, counted from the day the application is complete. If the town hall does not answer in time, the licence is in principle considered granted (positive silence), with one important exception: silence can never grant something that breaks the law or the local plan. A pool that does not comply is not legalised by a slow town hall.

Once granted, a licence normally gives six months to start the works and three years to finish them, unless the local plan says otherwise.

Practical tip: a missing document stops the clock, because the three months only run from a complete application. Start the paperwork while the pool design is being finalised.

What does a pool permit cost?

The permit cost has two parts, and both are a percentage of the declared construction budget (the material execution cost, without VAT and professional fees):

  • ICIO, the construction tax. Spanish law caps it at 4 %, and each town hall sets its own rate.
  • The licence fee (taxa), also a percentage, set in each town hall’s tax ordinance.

Because both are calculated from the declared budget, the budget in the project matters: it should be realistic and itemised. On top come the architect’s fees and, in some town halls, a deposit for construction waste.

Rates by municipality

MunicipalityICIOLicence feeOrdinance
Palma4 %2.61 % of the costICIO 2022, fee 2019
Calvià4 %1.68 % of the costICIO 2016, fee catalogue 2021
Llucmajor3.5 %1.35 % of the costICIO 2025, fee 2022
Sóller3.5 %check with the town hallICIO 2023
Alcúdia3.2 %1.25 % of the cost2015
Marratxí3.2 %1.30 % of the costICIO 2019, fee form 2022
Felanitx3 %0.80 % of the costICIO 2016, fee 2014
Pollença2.8 %0.80 % of the cost2020
Manacor2 %0.98 % of the costICIO 2020, fee 2015

Rates as published in each town hall’s tax ordinance, year of the ordinance in the last column. Town halls revise their ordinances, so confirm the current rate before you budget. Andratx and Santanyí both changed their ICIO ordinance in 2024; ask the town hall for the current rate. For other municipalities, the town hall’s tax ordinances (ordenances fiscals) are published on its website and in the Balearic official gazette (BOIB).

What happens if you build without a permit?

Building a pool without the required licence is a serious urban planning infraction under the Balearic law. The consequences:

  • A fine based on the value of the works: 50 to 100 % on urban land, 100 to 250 % on rustic land and 250 to 300 % on protected rustic land.
  • Legalise or restore. The town hall requires you to apply for the licence within two months. If the pool cannot be legalised, the land must be restored to its previous state.
  • The problem stays with the property. The obligation to legalise or restore passes to later buyers. The town hall can act for eight years after the works are finished, and on protected rustic land without any time limit.
  • Tax is due anyway. ICIO is owed from the moment works start, licence or not.

Frequently asked questions

Do I need a permit for a small or prefabricated pool?

Normally yes. Any pool that needs excavation falls outside the simple notification route in Balearic law. Confirm with the town hall before work starts.

How much does a pool permit cost in Mallorca?

ICIO of 2 to 4 % of the construction budget depending on the municipality, plus a licence fee that is also a percentage of the budget (from 0.8 % to 2.61 % in the municipalities listed above). The architect’s fees come on top.

How long does the town hall take?

At most three months from a complete application. If it does not answer in time, the licence is in principle granted, but never for a pool that breaks the rules.

Can I build a pool on rustic land?

It can be possible. The pool must belong to a single-family home on the finca, with one pool per finca, at most 35 m² of water surface and 60 m³ of volume. The rest of the rustic land rules and the local plan apply on top, so check with the town hall early.

Who applies for the permit?

You do, as the owner, with a project drawn up by an architect or technical architect. Agree early with your architect and pool company who prepares and files which part of the paperwork.

Get help with your pool project

Tell us about your pool and the property once, and we pass your request to vetted pool companies that quote you directly. Ask each of them how they handle the licence application, so the permit is part of the plan from the first quote.

This guide is general information, not legal advice. Last reviewed November 2026.

This might be interesting to you

Fincas hero
Mallorca Pool Builders 02.07.2026 4 min

Building a pool on rustic land in Mallorca: what the rules allow

Yes, it is possible, but with conditions: a legal dwelling, one pool per finca and a 35 m2 limit on ...

Townhouse hero
Mallorca Pool Builders 21.08.2026 2 min

Selling a House With a Pool on Mallorca: What the Buyers Inspection Will Find

Buyers now run pool checklists before offering. What their inspection finds, what each finding costs...

Swimming pool in Mallorca
Mallorca Pool Builders 12.06.2026 6 min

Concrete vs fibreglass pools: which is right for your Mallorca home?

Concrete or fibreglass for your Mallorca pool? Compare cost, durability, design freedom and build ti...

Pool renovation hero.webp
Mallorca Pool Builders 16.07.2026 6 min

Pool crack repair in Mallorca: when a crack is serious

Finding a crack in your pool is unsettling, but not every crack is a crisis. Most cracks in Mallorca...

Mallorca Pool Builders